Power System Improvement Project

The objectives of the project were to increase efficiency of hydropower generation; expand the generating capacity of the major hydropower plants; increase system operating efficiency of the power generation and transmission facilities; reduce losses in the electricity distribution system; facilitate the development of an independent power plant industry; and facilitate the re-integration of the Borrower into UCPTE.

Area of Evaluation: 

Mitigation

Thematic Cluster: 

Renewable energy

Theme of Evaluation: 

Renewable Energy

GEF Funding: 

No

Level of Evaluation: 

Country

Region: 

Europe and Central Asia

Type of Evaluation: 

Implementation Completion Report

Institution: 

World Bank

Evaluation Author: 

Infrastructure and Energy Services Department (ECSIE)

Year of Evaluation: 

2005